For roughly a decade, the south edge of Parkston looked the same from one summer to the next. This year it doesn't. Trucks are moving on ground that used to be farmland, gravel has been laid where there wasn't a road, and the shape of an 11-lot business park is starting to read from Highway 44. If you live here, you've probably driven past it more than once and wondered who is behind it, what it will hold, and whether it's the start of something or a one-off.
It's the start of something, and the interesting part isn't the acreage. It's the financing stack behind it, which Parkston has quietly used before, and which explains why the next few years on this side of town will look different from the last ten.
The 42 acres, and who is actually building it
The project is called the Trojan Business Park, and it's being led by the Parkston Area Development Corporation, the nonprofit that handles business recruitment and retention for the city. The site covers 42 acres just south of town and has been platted into 11 lots aimed at light manufacturing and value-added agriculture tenants. Early projections put full-time job creation at roughly 17 positions once the park fills in, with room to grow if larger tenants combine parcels.
Total project cost sits at $6.65 million. That figure covers land acquisition, roads, water and sewer extensions, and the professional fees that come with converting raw ground into buildable industrial lots. It is not a small number for a town of Parkston's size, and understanding how it got assembled is the whole story.
Follow the money
Rural business parks rarely get financed out of a single pocket. This one didn't either. The pieces:
| Source | Role | Amount |
|---|---|---|
| City Tax Increment Financing district | Infrastructure, land, fees | $4.96 million |
| REED Fund loan (via East River Electric) | Low-interest capital | $1 million |
| Dakota Resources | Low-interest capital | Bridge tier |
| Farmers State Bank of Parkston | Bridge financing | Interim |
| SDDOT and Governor's Office of Economic Development | Highway 44 turning lanes | Grant applications pending |
Projected interest on the associated loans runs roughly another $1 million on top of the base project cost. The TIF is the load-bearing piece: it lets the city fund the up-front infrastructure now and pay it back over years out of the incremental property tax the finished park will generate. Nothing on the current tax rolls shifts to cover it. That is the appeal of a TIF in a town Parkston's size, and it is why residents will not see a line-item hit on their bills for the roads and utilities going in south of Highway 44.
The REED loan matters for a different reason. Southeastern Electric Cooperative helped the Parkston Area Development Corporation land the loan even though the park sits outside its service area, on the argument that new jobs and tenants nearby would eventually benefit its members anyway. Chad Kinsley, Southeastern Electric's CEO, described the project as the kind of investment meant to keep the next generation living in or near the towns where they grew up. That framing tells you what the money is really chasing: not tenants first, but retention.
Why this playbook looks familiar
Parkston has run a version of this before. In 2012, Hutchinson County approved a TIF that helped fund a $1.99 million expansion for MDS Manufacturing, a Parkston-based operation, including the infrastructure work required to make the expansion viable. As of 2024, that district had generated roughly $1.69 million in incremental taxable value, according to the South Dakota Annual Report on Tax Increment Financing cited by the Mitchell Republic. In other words, the tool worked. The 2012 TIF didn't just cover its own cost. It grew the taxable base under it.
That precedent is why local officials are willing to run a larger TIF now. Dave Lambert, who serves as regional development director through the Dakota Heartland Development Association, has been public about the philosophy driving it:
If a town isn't growing, it's dying.
That is a blunt line, and it lands differently in a town that watched population and business counts stay flat for the better part of a decade. Lambert has connected the argument to the concrete stakes for Parkston residents: schools and the hospital need a taxable base and a working-age population to stay viable at current service levels. A business park is not a school funding mechanism on paper. In practice, over ten and twenty year horizons, it becomes one.
What changes on Highway 44
The visible piece for most residents will be the highway itself. Increased truck traffic in and out of an 11-lot industrial park is enough of a safety and capacity issue that turning lanes off Highway 44 are being pursued through South Dakota Department of Transportation and Governor's Office of Economic Development grant channels. Those turning lanes are not incidental. They are the piece that determines whether the park can host the kind of tenant that runs a full-shift semi schedule versus the kind that operates out of a single dock door.
For anyone who commutes south of town, that means the intersection you use today is likely to look different within a couple of construction seasons. For anyone with land or a home fronting that stretch, the traffic pattern shift is worth watching now rather than after it happens.
The signal for people who already live here
Parkston's Commercial Club runs the summer concert series that fills the park on Thursday nights. The Parkston Area Development Corporation runs the industrial recruitment on the south edge. These are not the same conversation, but they are the same civic muscle, and both are moving at once for the first time in a while. The Trojan Business Park is the largest single piece, but it sits inside a broader pivot the town leadership has been describing openly: after roughly a decade of limited growth, Parkston is now pushing on industrial, residential, and infrastructure fronts in the same window.
For residents, three things are worth tracking in the next twelve to twenty-four months:
- Which tenants sign first. The mix of the first two or three lots to fill will tell you whether the park skews toward light manufacturing, ag processing, or logistics. Each of those brings a different job profile and a different daily traffic pattern.
- The turning-lane timeline. The state and federal grant awards will govern whether Highway 44 improvements arrive with the first tenants or trail them by a year or two.
- The next TIF conversation. Parkston has used this tool for both industrial and housing projects before. If the city or Hutchinson County opens a second TIF in the next couple of years, the target is likely to tell you where growth is expected to concentrate next.
None of this is speculative. The financing is closed, the ground is moving, and the precedent from 2012 is on the books. What the Trojan Business Park represents, for people who already live in Parkston, is a decision the town has already made and is now executing. The construction south of Highway 44 is what that decision looks like from the road.
If you own property in the Parkston area and want to understand how nearby industrial and infrastructure activity might affect your parcel, your home's value trajectory, or your options as an owner or investor, the team at Mitchell Realty LLC works these markets every week and is glad to talk through the specifics. Contact a Local Expert to start that conversation.